Combined heat and power plant
Liebherr TBG 926 AGR

Year of construction
2002
Condition
Used
Location
Oranienburg Germany
Combined heat and power plant Liebherr TBG 926 AGR
Combined heat and power plant Liebherr TBG 926 AGR
Combined heat and power plant Liebherr TBG 926 AGR
Combined heat and power plant Liebherr TBG 926 AGR
Combined heat and power plant Liebherr TBG 926 AGR
Combined heat and power plant Liebherr TBG 926 AGR
Combined heat and power plant Liebherr TBG 926 AGR
Combined heat and power plant Liebherr TBG 926 AGR
Combined heat and power plant Liebherr TBG 926 AGR
Combined heat and power plant Liebherr TBG 926 AGR
Combined heat and power plant Liebherr TBG 926 AGR
Combined heat and power plant Liebherr TBG 926 AGR
Combined heat and power plant Liebherr TBG 926 AGR
Combined heat and power plant Liebherr TBG 926 AGR
Combined heat and power plant Liebherr TBG 926 AGR
more Images
Liebherr TBG 926 AGR
Liebherr TBG 926 AGR
Liebherr TBG 926 AGR
Liebherr TBG 926 AGR
Liebherr TBG 926 AGR
Liebherr TBG 926 AGR
Liebherr TBG 926 AGR
Liebherr TBG 926 AGR
Liebherr TBG 926 AGR
Liebherr TBG 926 AGR
Liebherr TBG 926 AGR
Liebherr TBG 926 AGR
Liebherr TBG 926 AGR
Liebherr TBG 926 AGR
Liebherr TBG 926 AGR
Show images
Show map

Machine data

Machine type:
Combined heat and power plant
Manufacturer:
Liebherr
Model:
TBG 926 AGR
Machine number:
02093098
Year of construction:
2002
Condition:
repair required (used)
Functionality:
not functional

Price & Location

Location:
Klagenfurter Straße 41, 16515 Oranienburg, DE Germany
Call

Technical details

Type of input current:
three-phase
Power:
190 kW (258.33 HP)
Input voltage:
400 V
Rotational speed (min.):
1,500 rpm
Rotational speed (max.):
1,500 rpm
Fuel:
domestic gas L
Overall weight:
1,900 kg
Type of cooling:
air
Nominal power (apparent):
237 kVA
Input frequency:
50 Hz
Operating pressure:
16 bar
Equipment:
documentation/manual

Details about the offer

Listing ID:
A145-77910
Reference number:
143124
Update:
27.03.2025

Description

With soundproof hood including control cabinet (display is dismantled and located in the control cabinet)
The generator is included in the price
General overhaul of the CHP system in 2022
Regular maintenance/inspection until September 2023
Non-functional CHP system -> we were informed that only the turbo is defective.
Godpfxsq R Ri As Abrskc

The system has been shut down for a year (an on-site functional test is not possible).

The system has not been dismantled. Disassembly and removal are the responsibility (costs, execution) of the buyer. (Inspection is possible).

We cannot provide any guarantees, and the warranty is excluded to the extent permitted by law.
Collection/disassembly is possible Monday to Thursday from 7:30 a.m. to 4:00 p.m. and Friday between 7:30 a.m. and 1:00 p.m.

The listing was translated automatically. Translation errors are possible.

Seller

Registered since: 2024

1 listing online

Call

Send inquiry

Countryus 
Germany
Austria
Switzerland
United States
United Kingdom
France
Belgium
Spain
Mexico
Italy
Netherlands
Poland
Russian Federation
Belarus
Ukraine
Estonia
Turkey
New Zealand
Ireland
Czech Republic
Denmark
Finland
Sweden
Norway
Luxembourg
Greece
Lithuania
Latvia
Iceland
Portugal
Brazil
Venezuela
Argentina
Hungary
Slovakia
Romania
Moldova
Slovenia
Serbia
Montenegro
Albania
Croatia
Bulgaria
Macedonia
Bosnia and Herzegovina
Israel
Egypt
Morocco
India
Indonesia
South Korea
Japan
Thailand
Malaysia
Vietnam
China
Taiwan
Iran
Bangladesh
Afghanistan
Note: Your inquiry will be forwarded to all sellers in this machine category. This allows you to receive a large number of offers.
The inquiry could not be sent. Please try again later.

Telephone & Fax

+49 175 2... show